What is required is CCC compulsory product certification, based on GB/T 18487.1-2023 and the supporting conductive charging system standards. The new rules issued by the CNCA in March 2026 formally bring electric vehicle conductive charging equipment into CCC catalog management and also clarify the list of applicable standards, implementation rules, and transition period arrangements.
The certification path consists of three parts: type testing, initial factory inspection, and post-certification supervision. Type testing is completed by laboratories with the corresponding qualifications, while factory inspections focus on batch production consistency and key component control. Only after obtaining the CCC certificate can companies apply the CCC mark to nameplates and packaging.
Two types of compliance need to be distinguished: CCC is China market access, while SDoC or destination-country certification is export access. The two have different standards systems, and test reports cannot substitute for each other.
AC charging piles, DC charging piles, and portable charging piles are all covered by the new rules, with units subdivided by power supply method and installation form. AC piles cover single-phase and three-phase, as well as different rated current levels; DC piles cover integrated and split types, with split types considered separately by power unit and terminal; because portable piles have flexible usage scenarios, the focus is on verifying residual current protection, cables, and plug assemblies.
| Product type | Included in CCC | Main safety standard | Key difference |
|---|---|---|---|
| AC charging pile | Yes | GB/T 18487.1-2023 | Residual current protection, grounding continuity |
| DC charging pile | Yes | GB/T 18487.1-2023 and supporting DC charging standards | Insulation monitoring, communication protocol consistency |
| Portable charging pile | Yes | GB/T 18487.1-2023 | Cable assembly, plug temperature rise, protection rating |
| Communication module supplied with the pile | With the complete unit | Assessed with the complete unit | No separate certificate; managed for consistency with the complete unit |
The table above only lists certification attribution relationships; specific unit division is subject to the implementation rules. Whether different power levels in the same series can be merged into one unit depends on whether key components, structure, and electrical architecture are consistent.
The new version tightens requirements in four areas: safety protection, control pilot, environmental adaptability, and information marking, and old-version reports cannot be used directly. The differences are mainly reflected in:
For models already tested under the old version, it is usually necessary to supplement difference-item testing according to the new version rather than redo the entire set. The list of difference items is determined by the laboratory based on product structure and existing reports.
GB/T 27930 governs the communication protocol between DC charging piles and vehicles, while GB/T 18487.1 governs the general safety requirements of conductive charging systems; the relationship is "safety foundation + communication layer." When DC piles undergo CCC, safety items are based on the GB/T 18487.1 series, and communication consistency is assessed according to GB/T 27930.
AC piles do not involve the message interaction of GB/T 27930, but the control pilot part remains within the GB/T 18487.1 framework. When companies certify DC piles, they should place protocol consistency and safety testing in the same round of sample preparation to avoid repeated sample submission.
The transition period proceeds in a "first acceptance, then deadline" manner. After the new rules are issued, a certification window is set, and after the window ends, products without certification stop leaving the factory and being sold. Specific milestones are subject to the CNCA implementation rules announcement, and companies should work backward from the announcement date.
In terms of scheduling, the type testing cycle is usually 4-8 weeks, with factory inspection and corrective actions taking another 2-4 weeks. For highly complex products that require corrective actions, the overall cycle will be longer. It is recommended to reserve time for at least one round of corrective actions before the deadline.
First sort out product units and compare standard differences, then lock down the sample and key component list, and prepare factory inspection documents at the same time. Specific actions:
As long as products leave the factory, are sold, or are imported within China, CCC is required; models that are purely for export and not sold domestically are handled according to destination-country requirements, but production consistency management is still recommended to follow the CCC framework.
They cannot be directly exchanged for a certificate. Difference-item testing according to the new version is required, and after the laboratory issues a supplementary report, the CCC process can begin.
Generally not. The electrical architecture, key components, and applicable standard clauses of the two differ considerably, so they are usually applied for separately as different units.
The difficulties lie in cable assemblies, plug temperature rise, and protection rating. Diverse usage scenarios make assessment conditions more complex, so sample preparation must be sufficient.
Products without a CCC certificate may not leave the factory, be sold, or be imported, and products already shipped may also face market supervision spot-check handling.
Send your product spec and target market — we reply with scope, timeline and cost within one business day.
Email Mr. TaoBeice Testing · Tao Gong · CNAS L5516 · CMA 202319013572 · NTEK Group Partner Lab · Shenzhen, China
+86 199-2684-3993 · taowushuang@ntek.org.cn · 中文站